At Optimise Heat & Steam, we provide bespoke services and solutions to new or pre-existing breweries. We have worked with a number of well-known breweries in the design, supply, installation and maintenance of brewery equipment.
Our team can offer the following brewery equipment services:
- Brewery equipment and sizing
- Clean in place systems (CIP), such as keg washers
- We undertake the fabrication and installation of Hygienic Process Pipework
- Extensive knowledge of Steam and Process Pipework
- Maintenance
We can provide temporary industrial/commercial steam boilers to reduce downtime for your business.
The below table shows how many barrels you can produce in an estimated square footage of space, and how much energy is required to run an electric steam boiler system. This is a rough guide only.*
SIZE (BARRELS) | MIN & MAX AREA (FEET) | TOTAL ELECTRICITY REQUIRED |
---|---|---|
6 | 700 – 1000 | 28KW 415v |
8 | 800 – 1100 | 37KW 415v |
10 | 1000 – 1200 | 40KW 415v |
12 | 1200 – 1400 | 45KW 415v |
15 | 1400 – 1600 | 60KW 415v |
*An example of sizing is purely for the Brew House.
**If there is the intention of bottling real ale, then another 200 – 300 squared feet will be needed.